Building a pool in Hollywood
Hollywood — about 155,000 people between Fort Lauderdale and Miami — is Broward's classic 1920s coastal city: a narrow beach strip east of the Intracoastal, then densely built mainland neighborhoods running west. Lots are small and the water table is high, so drainage and access shape most builds. The Building Division handles pool permits, with applications submitted through the city's online permitting portal and records managed in the Accela Citizen Access system.
Permits and local rules
The city publishes its Swimming Pool / Spa Checklist (rev. July 2024) and a Permits page for the process. The essentials:
- A notarized uniform application. The Broward County Uniform Permit Application for the structural work is submitted by a licensed contractor, with a separate uniform application for each sub-permit: electrical, mechanical, and plumbing.
- The HOA affidavit is mandatory even with no HOA. An Association approval letter and an Affidavit of Awareness must be submitted — "even if you do not belong to an Association."
- Plans spell out the site conditions. The submittal plans must show soil conditions — a geotechnical report or a soil statement — plus the flood zone (BFE and DFE), materials, foundation schedules, and the child-protection barrier plan, such as door alarms or a perimeter fence with self-latching gates.
- A certified survey with elevations, showing compliance with NEC Article 680.8 overhead conductor clearances.
- A dewatering affidavit, only if applicable. When the job needs dewatering, the contractor and owner execute and notarize a dewatering affidavit as part of the submission.
- The Safety Act form. The Residential Swimming Pool, Spa and Hot Tub Safety Act notice-of-requirements affidavits come with the package.
- NOC timing. A recorded Notice of Commencement is required if the contract price is greater than $5,000 — a pending NOC will not hold up permit issuance, but it will hold up scheduling the first inspection.
- Pilings change the path. If the pool sits on pilings, a Special Inspector form and plans join the submission.
Lots, soil and climate
Hollywood sits low and flat between the Atlantic and the Everglades edge, so the water table is close to the surface and the checklist treats dewatering as a conditional item, covered by a notarized affidavit when it applies. Beachside and Intracoastal lots carry salt-air corrosion the same way Fort Lauderdale's do, and all of Broward builds inside the High-Velocity Hurricane Zone under the 2023 Florida Building Code, 8th Edition (floridabuilding.org), so screen enclosures and glazing need impact-rated, wind-tested products.
The swim season runs all year, which pushes scheduling pressure onto hurricane season (June through November) rather than winter — enclosure lead times stretch after every named storm.
What drives the price and what to ask
- Dewatering: when the dig needs it, pumps and disposal add real cost on flat, wet mainland lots.
- HVHZ enclosures: impact-rated screens and glass cost more than standard Florida specs.
- Beachside logistics: small yards and tighter staging on the beach strip.
- Salt air: corrosion-resistant equipment and placement matter within blocks of the ocean.
- HOA and sub-permits: association approval and the electrical, mechanical, and plumbing sub-permits all line up before the dig starts.
Questions to ask each custom pool builder:
- Will you prepare the notarized uniform application, the soil statement or geotechnical report, and the dewatering affidavit if my dig needs one?
- Who pulls the electrical, mechanical, and plumbing sub-permits, and who submits through the city's permitting portal?
- Will you handle my HOA's approval letter and the required city affidavit?
- When do you record the Notice of Commencement so it does not hold up my first inspection?
- Does your enclosure quote use HVHZ-approved, impact-rated products for Broward?
- What corrosion-resistant equipment do you install near the beach, and what does the warranty cover?
- How do you schedule around hurricane season, and what happens to lead times after a named storm?